South of Midland, TX Wellsite Gas Processing Facility

I. Scope of Work
Furnished equipment and operations
for Wellsite Facility including:
• (1) Cat 3516 Inlet Gas Compressor
• (2) Skid Mounted 65 ton Mechanical
Refrigeration Units (MRU) with NGL Stabilizer Towers
• (4) 18,000 gallon NGL Bullet Tanks with unloading bulkheads
•Full Operations & Maintenance

II. Contract Type
Rental contract including
equipment and operations

III. Overview
- Due to the pre-packaged, single skid design, Torrent was able to install and
commission equipment on the existing facility.
- Processed ~6.0 MMscfd of 1450 Btu gas. Removed the majority of C3+ as well
as dehydrated the gas stream to less than 5#/MMscfd using our skid mounted TRU-65 MRUs.
- The equipment operated reliably and met all required gas
conditioning and NGL specifications.
- Used the conditioned gas to provide the fuel to the inlet gas compressor & generators.

IV. Equipment included:
• ASME Code Equipment
• PLC Controlled Automated Process
• Design Basis for Broad Operating Ranges
• Robust Equipment for Improved Run-time

Listing created Dec 11, 2022