I. Scope of Work
Gas Processing Services, consisting of:
- (5) Skid Mounted 65 Ton Mechanical Refrigeration Units (MRU) with NGL Stabilizers
- (5) Skid Mounted 18,000 gallon NGL Storage Tanks with unloading bulkhead(s)
- Full Operations & Maintenance.
II. Contract Type
Two (2) - 12 Month Term Service/Rental Contracts
III. Overview
- Torrent provided and delivered a full complement of gas processing equipment and services.
- Torrent’s equipment and services allowed our customer the flexibility to scale and proceed with early takeaway
as more permanent infrastructure was eventually constructed and set.
- Processed ~23 MMscfd of 1430 Btu gas as well as dehydrated to less than 5#/MMscfd to meet the hydrocarbon dewpoint spec in order to sell gas to an existing pipeline using our skid mounted TRU-65 MRUs.
- Used the conditioned gas to provide the fuel to three (3) Cat 3516's.
IV. Equipment included:
• ASME Code Equipment
• PLC Controlled Automated Process
• Design Basis for Broad Operating Ranges
• Robust Equipment for Improved Run-time
Removed user
2 years agoSuper awesome! Looks like you all do great work. Just curious, does your clients renting the equipment do all the permitting, applications, etc.?
Torrent Energy Services
2 years agoHi Nathan. Torrent provides the service which includes the equipment and full operations. The producer will provide any necessary permits for their location although we typically are able to assist them by providing the applicable information. Let me know if you have any additional questions or if there’s an application we can look at for you. Thx Harry
Gary Johnson
2 years agoGood Evening Torrent. Are you currently looking for Asset based Carriers to move and relocate your Heavy and Over Dimensional Frieght? If so I'd love to have a conversation in those regards.