North Louisiana Gas Treating & Processing Facility

Scope of Work

Furnished gas treating and processing train

Overview

The prepackaged, single skid design enabled Torrent to install and commission equipment in three weeks. The equipment operated reliably and met all required gas conditioning and NGL specifications. The equipment includes:
-ASME Code Equipment
-PLC Controlled Automated Process
-Design Basis for Broad Operating Ranges
-Robust Equipment for Improved Run-Time

Project consisted of

  • (1) 10-GPM Amine Plant with Thermal Oxidizer, Coalescing Filter Separator, Vent Scrubber, Air Compressor Skid
  • (1) Skid Mounted 35 ton Mechanical Refrigeration Unit with NGL Stabilizer Tower
  • (2) 18,000 gallon NGL Bullet Tanks with unloading bulkheads

Contract Type

Full Service Contract with Equipment and Operations

Listing created Dec 16, 2022

Public discussion (0)