Scope of Work
Furnished gas treating and processing train
Overview
The prepackaged, single skid design enabled Torrent to install and commission equipment in three weeks. The equipment operated reliably and met all required gas conditioning and NGL specifications. The equipment includes:
-ASME Code Equipment
-PLC Controlled Automated Process
-Design Basis for Broad Operating Ranges
-Robust Equipment for Improved Run-Time
Project consisted of
- (1) 10-GPM Amine Plant with Thermal Oxidizer, Coalescing Filter Separator, Vent Scrubber, Air Compressor Skid
- (1) Skid Mounted 35 ton Mechanical Refrigeration Unit with NGL Stabilizer Tower
- (2) 18,000 gallon NGL Bullet Tanks with unloading bulkheads
Contract Type
Full Service Contract with Equipment and Operations