Complete pigging/purging activities, excavation, cut outs, tie ins, coating, and backfill on (48) anomalies stretching from Artesia, NM to El Paso, TX during a 4 day critical outage between two refineries. Locations ranged from inside the city limits of Artesia to the city limits of El Paso. All work completed safely and on schedule.
Keywords:
Anomaly, cut outs, welding, tie ins
Listing created
Jun 9, 2023