Isolate, blow down, demo, and re-build an existing 10" turbine meter station with a new 10" ultrasonic meter station including all new station piping, 30" stopple, 12" stopple, bypass piping with temporary measurement, meter run with bypass, civil work, dirt work, and fencing.
Keywords:
Meter Station, construction, tie ins, hot work
Listing created
Jun 12, 2023
RKT Operating, LLC
1 year agoWe would be happy to bid on any project that you need Pipe, Valve or Fittings. Just email me a BOM of that project and I'll price it out for you. There is never a charge for deliveries to any location in Texas.
Thank you,
Jerry Mccarty
RKT Operating
432-257-1811
jmccarty@rktoperating.com