Lay and tie in 3 miles of 10" SDR 11 HDPE. Scope included: mainline construction, (3) meter site tie ins, (2) cased road bores (HDD), and (1) tie over between two existing pipelines (all steel fabrication).
Keywords:
Pipeline, construction, fusion, welding, tie ins, ditching
Listing created
Sep 24, 2023