12" Pipeline: Smart Tool Recovery

Emergency call out to recover a smart tool stuck in an existing 12" pipeline. Work included installation and execution of (2) 12" 600# stopples, liquids drain up, cut out, tie ins via welding, installation of 10' of welded sleeve, and laying/testing of new FBE pipe off site. All work completed in an existing pipeline corridor in rock conditions.

Keywords: Stopple, pigging, tie ins, welding, hot taps
Listing created Oct 11, 2023

Public discussion (1)

Alberto Lopez

5 months ago

Hello,

I’m Alberto, a freight supervisor at TTL, I offer shipping and transportation services, which I think could be a great fit for your company. I'm reaching out to see if you'd be interested in working together.

You can contact me at 323-553-1016

alberto@totaltransportlogistics.us

You must log in to send a new comment.