Emergency call out to recover a smart tool stuck in an existing 12" pipeline. Work included installation and execution of (2) 12" 600# stopples, liquids drain up, cut out, tie ins via welding, installation of 10' of welded sleeve, and laying/testing of new FBE pipe off site. All work completed in an existing pipeline corridor in rock conditions.
Keywords:
Stopple, pigging, tie ins, welding, hot taps
Listing created
Oct 11, 2023
Alberto Lopez
12 months agoHello,
I’m Alberto, a freight supervisor at TTL, I offer shipping and transportation services, which I think could be a great fit for your company. I'm reaching out to see if you'd be interested in working together.
You can contact me at 323-553-1016
alberto@totaltransportlogistics.us