Flange Spreader Maintenance: A Comprehensive Guide

Flange Spreader Maintenance:
A Comprehensive Guide

ESI’s unwavering commitment to safety and performance is exemplified by the meticulous care given to their rental fleet. Prior to each job and upon immediate arrival, all tools undergo thorough cleaning, testing, and lubrication. This rigorous process ensures top-notch performance and safe operations.

Mechanical 11 Ton Zero Gap Flange Spreader (AKA SG11TM)
Today we are preparing the SG11TM for an upcoming rental job next week. We are going to take this opportunity to show how to safely maintained your tool to maximize it’s life span, ensure durability, and safe operations.

Step 1
In addition to maintaining your tools before and after jobs. These steps should be completed on a regular bases. The first Step would be to establish a schedule and create a system to record and document.

Step 2
Place the tool on a bench or flat surface, ensuring that the right-hand side is facing down.

Step 3
Remove or replace the collet union, actuator, and cantilever retaining rings, exercise caution to avoid overstretching the retaining rings.

Step 4
Remove the open leg l/h and closed leg l/h from the tool

Step 5
Remove the actuator and cantilever from the tool

Step 6
First, degrease and clean the left-hand side of the tool. Next, lubricate all moving parts and areas where metal meets metal. Be careful not to disturb the centering springs.

Step 7
Reassemble the tool.

Step 8
Once your tool is reassembled flip the tool and repeat steps 2 thru 6.

Now your tool is ready for any job!

Keywords: Flange Spreader, secured grip flange spreader, bolt hole flange spreader, Maintenance, flange spreader rental, valves, zero gap
Listing created Apr 28, 2024

Public discussion (0)

You must log in to send a new comment.