Provide support and construction crews to complete the installation of (1) 24" 600# mainline block valve with 12" tie overs and blow downs, (1) 24" 600# compressor discharge valve, and (1) 2" fuel gas filter separator all during the same mainline outage at different locations spanning approx. 60 miles. All work completed safely, and on schedule. Project scope included: all pre-fabrication/testing, excavation, crane work and critical lifts, Nitrogen purging, line evacuation, final tie ins via welding and bolt up, clean up, coating, paint, and fencing.
Keywords:
Tie ins, block valve, mainline, welding, crane, critical lift, filter separator