26" 600# Gate Valve Replacement
Remove and replace an existing weld in 26" 600# gate valve in an existing compressor station. Isolate and blow down piping via 1-30" and 2-26" 600# stopples. Isolate, blowdown, and replace valve setting with new valve and goal post blow down assembly all while station was in service. Install all new stopple fittings, anchor block, and TOR's in house.