Flowline Installation: Ditch Work

Provide manpower and equipment required to cut ditch for new flowlines in caliche​/​rock conditions. Work included clearing ROW, pot-holing, ditching approx. 4,800LF (6' wide, and 5.5' deep), bedding, padding, and backfilling. Work completed using Arguijo owned: Vermeer T1055 trencher, CAT 345 excavator, Doosan 340 hammer hoe, 160H maintainer, and hydro-vac truck.