Oh no, something went wrong. Please check your network connection and try again.
Pad Site Construction: Battery Energy Storage System (BESS)
Provide survey, clearing, grubbing, mulching, site cut/fill, import, density testing, and all dirt work required to build new pad on grade for a new BESS installation. Civil scope includes: dirt work, fencing, and survey.
Location
Reviews (0)
About the listing author
Hello, I'm Arguijo Corporation.
Arguijo Corporation was established in 1975 in Kermit, TX and is now headquartered in Odessa, Texas with additional locations in Albuquerque, New Mexico along with a…
Arguijo Corporation was established in 1975 in Kermit, TX and is now headquartered in Odessa, Texas with additional locations in Albuquerque, New Mexico along with a…
Pad Site Construction: Battery Energy Storage System (BESS)
Pad Site Construction: Battery Energy Storage System (BESS)