Trunkline

Oh no, something went wrong. Please check your network connection and try again.

Pipeline Construction: 3 miles of 10" SDR 11 HDPE

Lay and tie in 3 miles of 10" SDR 11 HDPE. Scope included: mainline construction, (3) meter site tie ins, (2) cased road bores (HDD), and (1) tie over between two existing pipelines (all steel fabrication).

Location

Reviews (0)