Pipeline Construction: 8 miles of 8" Steel
Project consisted of 8 miles of new mainline which replaced an existing 8" that remained in-service during construction (center line of new and existing as close as 3' in places). Mainline included approx. 6,000LF of installation inside the city limits requiring traffic control, and working diligently with city officials. Tie ins to existing facilities included multiple block valve locations, launcher, receiver, as well as 34 farm taps tying into existing/active residential gas meters. Tight ROW areas, and over 3,000LF of HDD installations made for a challenging and complex project. All work completed safely, and in-house by Arguijo crews.