Isolate, blow down, demo, and re-build an existing 10" turbine meter station with a new 10" ultrasonic meter station including all new station piping, 30" stopple, 12" stopple, bypass piping with temporary measurement, meter run with bypass, civil work, dirt work, and fencing.
Keywords:
Meter Station, construction, tie ins, hot work
Listing created
Jun 12, 2023
RKT Operating, LLC
11 months agoWe would be happy to bid on any project that you need Pipe, Valve or Fittings. Just email me a BOM of that project and I'll price it out for you. There is never a charge for deliveries to any location in Texas.
Thank you,
Jerry Mccarty
RKT Operating
432-257-1811
jmccarty@rktoperating.com